Dominion Colour Corporation Shower Refurb

DCC commissioned J and C Projects to refurbish their outdated showering and changing facilities. Old plaster was removed back to original brickwork,  made damp-roof then re-cladded with moisture resistant plaster board. installation of white rock pvc cladding, as well as adding four additional high level windows for natural light. Finishing with a suspended ceiling with state of the art extraction system with washing and drying facilities.

 

Greens Lane Phase 2

Greens lane has now reached phase 2 of the build process. Foundations have been poured with the erection of trench block has begun to take shape and rise out of the footing. Phase 3 will contain the construction of the bison beam floor and the rsj supports.

Greens Lane Phase 1

J&C Projects have recently undertaken a contract to construct a 3 bedroom bungalow in a scenic settlement at the top of Greens Lane Rossendale in  Lancashire. Work has quickly commenced with the removal of all shrubbery, trees and earth and disposed of inline with environmental policies. Phase two will consist of landscaping & grading with excavations of footings ready to lay the foundations.

 

 

J&C At Worsley Cup Final

J&C were proud to be in attendance as a a sponsor at the JW Lees  Worsley Cup Final as one of our own team members , Joe McCluskie was playing for the Burnley Team who narrowly missed out on the trophy after a very close game.